Loading in Australia




Just in time and complete delivery to reduce installation costs.

The Biodiesel Module, designed by Lurgi, manufactured in Henderson (Australia), was transported on MV Wiebke (SAL). Two problems had to been solved: -the lifting height and the foundation for seatransport, due to the fact that in the original plan the 320 ton module had only point loads onto the deck. Some parts had to be dismounted on top of the module to ensure swinging in the module by the two portside ship cranes. This was checked by 3D clash test.

An additional framing system had to be designed and mounted to ensure the weight distribution on deck.

This module can be an example for a couple of refinery modules transported in the past like “Ormen Lange Project (Norsk Hydro), “Melkoya Project” (Statoil), “Janmargar” (Reliance) etc.